Flextern - topkwaliteit lessenaars - state of the art lecterns - far beyond elevation

Always perfectly audible

  • Options
  • Movie
  • Sales
  • About Flextern
  • How it's made
  • Gallery
  • Interaction
  • Newsletter
  • Research phase
  • Conceptual phase
  • Constructional phase
  • Choice of material
  • Engineering
  • Prototype
  • Finetuning
  • Production
  • New in 2009
  • New in 2010
  • info@flextern.com
  • Contact
  • FAQ
  • Sitemap
  • Testimonials
  • Disclaimer
  • Eersteschetsen
    Constructional phase 1/9 » A prototype was designed based on preliminary sketches. Click to view larger photos.
  • Kosten
    Constructional phase 2/9 » Cost calculation forms an important part of this process.
  • Proefmodel
    Constructional phase 3/9 » First model ready to be tested.
  • Lessenaar1
    Constructional phase 4/9 » 3D modelling in consecutive steps.
  • Lessenaar2
    Constructional phase 5/9 » 3D modelling in consecutive steps.
  • Lessenaar3
    Constructional phase 6/9 » 3D modelling in consecutive steps.
  • Lessenaar4
    Constructional phase 7/9 » Various parts portrayed in 3D.
  • Lessenaar5
    Constructional phase 8/9 » Various parts portrayed in 3D.
  • Lessenaar6
    Constructional phase 9/9 » Various parts portrayed in 3D.